DAY-20 2-August-22
Passed Electrical Rough Inspection!!!
Installed GFCIs, duplex outlets, switches, high bay lights, and cover plates.
Tested all circuits and verified that we were ready for final inspection
Barn Store came back and installed the "Y" braces on the porch posts
and corrected the south door trim.
WHAT IS NEXT: Electrical Final Inspection scheduled for Thursday 4 Aug
Complete final grading (scheduled for 9 August)